Measure · ISO 27001 and other standards
Protect utilities and cabling during operation and maintenance
Check required site utilities and cable routes. Connect suitable outage protection to proper maintenance and a safe return to operation.
Reuse existing records
Use existing plant and network plans, manufacturer documents and maintenance records. Business objectives and recovery remain in the existing BIA and emergency procedures. No additional infrastructure policy or maintenance spreadsheet is needed.
What to do
- 1
Record dependencies and protection needs
Identify required power, communication, cooling and other utilities with service owners. Use business objectives and the existing BIA to assess outage effects. In the existing service or plant inventory, record dependency, capacity, operator, required protection and responsible role. Clarify common failure causes across multiple feeds or providers.
- 2
Protect utilities and cable routes
Implement the protection and alternatives actually needed through competent planning. Check capacity, interactions and manufacturer conditions. Clarify necessary alarms, emergency lighting, emergency communication, safe shutdown and reachable outage contacts. Appropriately separate networked utility controls and connect them securely to the internet only when necessary. Protect cables and connections against damage, interception and interference, separate interfering power and data routes professionally and keep source and destination traceable. Secure accessible distribution points; involve necessary specialists for critical routes.
- 3
Perform maintenance securely
Derive maintenance scope and frequency from manufacturer, operational, contractual and, where applicable, insurance requirements. Use the existing maintenance plan. Only authorised people perform the work; clarify necessary confidentiality, supervision, controlled remote access and protection of information. Removal off site follows the existing device and media workflow. Record suspected or actual faults and preventive and corrective maintenance in the existing record.
- 4
Check function and return to service
Check required safeguards, alternatives and alarms at suitable intervals and after relevant interventions. Before return to service, inspect intended safe operation and possible tampering. End maintenance access no longer needed. In the existing record, note plant or cable, date, work, result, checking role and outstanding follow-up. Update plans when changes occur and connect outages to the existing recovery route.
Worked example
Two internet connections use the same building route
Fictional example: A service needs an alternative connection. A check reveals that both connections use the same vulnerable cable route.
- Independence and checking
- DecisionThe responsible role assesses the common failure cause and decides on a suitable different route or another agreed outage solution. After implementation, the required alternative is tested.
- EvidenceExisting service or plant record with dependency, business context, decision and actual test result.
Record the result
- Existing dependency and plant records with suitable utilities, cable routing and reasoned protection choices.
- Existing fault, maintenance and test records with actual results and a safe return to service.
Common implementation mistakes
Treating two connections as independent
Check shared cable routes and supply points.
Treating maintenance only as an availability task
Consider information access, authorised people and possible tampering during the work.
Reuse the implementation across requirements
The references below show which requirements the measure contributes to.
View controls and standards
- A.7.11 · VersorgungseinrichtungenGerman guide
The workflow determines required utilities, capacity and outage effects, provides suitable safeguards and alternatives and checks function and response.
- A.7.12 · Sicherheit der VerkabelungGerman guide
Cable routing and connections are protected against relevant damage, interference and unauthorised access, with traceable checks after changes.
- A.7.13 · Instandhaltung von BetriebsmittelnGerman guide
Manufacturer-based maintenance, authorised protected work, fault and maintenance records and checked return to service are included.
TISAX · 3.1.3
VDA ISA 6.0.3 · Partial overlap
The workflow addresses protection during maintenance and repair of supporting assets. Other lifecycle phases and specific protection requirements remain separate.
ReferenceTISAX · 5.2.8
VDA ISA 6.0.3 · Partial overlap
Utility dependencies and suitable alternatives contribute to ICT continuity when related to business objectives and tested. This does not establish complete continuity planning and recovery.
Reference
Templates for your implementation
Template
IT and site operations policy
Bring operational rules together and connect existing inventories, work instructions and recovery plans. Includes explained fields and an editing guide.
Free ZIP · DOCX, ODT and PDF · with editing guidance
Template
Existing information protection rules
One policy for information classes, labelling and handling. With fields and an example classification scheme to adapt to your organisation.
Free ZIP · DOCX, ODT and PDF · with editing instructions
Template
Use the existing IT recovery plan
Prepare responsibilities, fallback communications and executable service procedures. Take objectives from your BIA; keep actual incident events in the incident record.
Free ZIP · DOCX, ODT and PDF · with service procedure
Related resources
Related measure
Prepare suitable recoveryView measureBring business objectives and actual dependencies together in the existing plan.
Kopexa
Track actual operational work in KopexaExplore featureWhere needed, maintain ownership and dates against actual maintenance or corrective work.