Skip to main content

Guide

TISAX Maturity Model: Levels 0-5

The 6 maturity levels in TISAX assessments: what auditors expect at each level and how to reach Level 3.

Benjamin Schatter
|Updated|Read time: 4 minutes

The 6 maturity levels in TISAX assessments: what auditors expect at each level and how to reach Level 3.

The TISAX Maturity Model Explained

The maturity model describes how reliably a process operates and how it is integrated into the organisation. You assess applicable control questions in the VDA ISA from 0 to 5. Each score needs an explanation and suitable evidence; it is not determined by the number of uploaded documents.

Generally, maturity level 3 – established is the target for each question. Higher scores elsewhere do not cancel gaps. ENX allows a justified assessment below the target where there is no relevant risk. The audit provider evaluates this; it is not a blanket exemption from requirements.

Maturity goes beyond documentation · © 2026 Kopexa GmbH

The 6 Maturity Levels

Level 0: Incomplete

The process is missing, is not followed or does not achieve its purpose. For example, data should be recoverable, but there is no suitable backup or functioning recovery method. A finding is assessed by its significance; the score alone does not determine the result category.

Level 1: Performed

The process is performed and there is some evidence that it achieves its purpose, but documentation is absent or insufficient. For example, an administrator can restore a backup, but the procedure depends on their personal knowledge.

Level 2: Managed

The process achieves its purpose and is planned and managed. Responsibilities, resources and work products are controlled; documentation and implementation evidence are available. For example, backups and restores follow a documented plan and their results are retained.

Level 3: Established — the TISAX Target Level

The process follows a defined standard and is integrated into the overall system. Interfaces with other processes are defined, and sustained implementation is demonstrated over time. For backups, this connects system changes, responsibilities and recovery requirements.

Level 3 requires suitable roles, competence, resources and methods for evaluating effectiveness. A fixed KPI list or statistical process control is not the definition of level 3. Continuous quantitative monitoring with thresholds particularly characterises level 4.

Level 4: Predictable

The established process is quantitatively monitored and controlled using measures and thresholds that trigger intervention. For example, the team monitors defined recovery measures and follows specified rules when results are inadequate.

Level 5: Optimizing

Improving the predictable process is an explicit objective supported by dedicated resources. Changes and their effects are evaluated. Meeting the TISAX target does not require every process to reach level 5.

What the Auditor Expects at Each Level

LevelAssessment focusExample of evidence
0Purpose not achievedMissing or ineffective implementation
1Performed, largely informalObservable work product
2Planned and managedPlan, ownership and controlled results
3Standardised and integratedInterfaces and sustained operation
4Quantitatively controlledMeasures and intervention thresholds
5Deliberately optimisedEvaluated process improvement

The Typical Gap: From Level 2 to Level 3

A documented procedure may work well at level 2 without yet being integrated as an organisational standard. To move towards level 3, examine dependencies, handovers and sustained application.

What is typically missing at Level 2:

  • The standard process is unclear or unknown in some areas.
  • Handoffs are undefined, such as the link from departure to access removal.
  • Backup roles or required competence are missing.
  • Evidence of sustained use over time is missing.

Practice Example: Patch Management

Level 1: Patches address vulnerabilities, but the process largely depends on individual knowledge and is poorly documented.

Level 2: The team plans patches using a documented assessment, with assigned responsibilities and deadlines. Results and necessary deviations are handled traceably. Deadlines must fit risks and operating conditions.

Level 3: The standard process connects vulnerability assessment, change approval, testing and operations. Owners understand the handoffs, and records demonstrate sustained use. This does not automatically prescribe a particular patch-compliance percentage or a blanket 72-hour deadline.

How to Reach Maturity Level 3

For each applicable question, review what supports the current score and what is missing:

  • Define the standard process and its interfaces.
  • Provide ownership, backup roles, competence and resources.
  • Check actual application using suitable evidence.
  • Evaluate effectiveness and address weaknesses.
  • Explain the score and review it after changes.

Kopexa helps you handle missing implementation and evidence as concrete work. Your substantive assessment remains essential. The audit preparation guide explains how to substantiate your judgement with the provider.

Support assessments with implementation evidence

Our TISAX page shows how to work on outstanding measures, ownership and evidence together so that gaps become visible before the assessment.

Sources and reference date

Reviewed on 13 November 2026 using the ENX participant handbook and ISA 6, including the transition to ISA 2027.