Guide
Risk management software for insurers: Protect the claims process
Assess insurer risk software: distinguish ICT outages, providers and recovery from actuarial models.


A document service fails. New claims can still be registered, but assessment of some cases stalls, delaying payment. System availability alone does not explain how the backlog affects customers and operations.
This article concerns operational resilience: how can claims handling continue during ICT disruption? Compare software using two workload scenarios and three counter-tests. Actuarial models and the Own Risk and Solvency Assessment, ORSA, remain separate tasks.
Break the claims process into dependencies
Consider intake, assessment, decision and payment separately. A disruption need not affect them simultaneously. Which data, external services and people does each step require? Which fallback processing works, and when does backlog exceed available capacity?
These questions provide a concrete selection benchmark. A generic risk matrix can summarise results but cannot replace the underlying process analysis.
Peak load changes the assessment
An impairment during normal operation can have different consequences during high claims volumes. Use two explicitly hypothetical scenarios in your test: ordinary demand and a temporary increase in incoming cases.
Assess development over time, manual fallback and its limits. The backlog does not necessarily disappear when the service becomes reachable. Recovery also includes business follow-up work.
How Kopexa supports this assessment
In Kopexa, you can describe BPMN processes and examine affected information assets and other assets. The guided BIA uses impact dimensions and time windows, retaining reasoned recovery objectives and approved assessment states.
Risks and measures connect assessment with treatment. Evidence of a fallback procedure belongs to the measure; an existing concept differs from a successfully tested workflow. When an assumption changes, a risk review helps revisit the earlier decision specifically.
Three counter-tests for the supplier meeting
| Change | What must remain traceable |
|---|---|
| The provider lengthens its recovery commitment | Which process requirement can no longer be met |
| The fallback provider uses the same critical subcontractor | Whether assumed independence still exists |
| The tested fallback processes fewer cases than expected | Which treatment or prioritisation needs adjustment |
The product need not generate every technical detail itself. It must preserve the relevant basis and its responsible assessment. Define which system remains authoritative for contract and operational data.
Use this template in these measures
Implementation measure
Control access to secure areas
Mapped requirements (2)
- A.7.1 · Physische Sicherheitsperimeter (DE)
Supporting contribution
The workflow determines physical boundaries from protection needs, checks their continuous construction including other openings and maintains responsibility and changes in the existing plan.
- A.7.2 · Physischer Zutritt (DE)
Supporting contribution
Access rights and keys are issued, reviewed, changed and revoked. Visitors and deliveries use suitable controlled routes with instructions, supervision and protected appropriate evidence.
Further framework mappings of this measure
TISAX · 3.1.1
VDA ISA 6.0.3 · Partial contribution
The plan, access rules and walkthrough support site assessment. Other requirements and the assessment scope need separate evaluation.
Read the source ↗
Implementation measure
Manage ISMS risks and objectives together
Further framework mappings of this measure
ISO/IEC 27001 · 6.1.1
ISO/IEC 27001:2022 + Amd 1:2024 · Supporting contribution
Planning derives risks and opportunities for intended ISMS outcomes, prevention or reduction of undesired effects and improvement from context and requirements. It connects actions, integration and effectiveness evaluation. Specific decisions and execution remain operational work.
Read the source ↗ISO/IEC 27001 · 6.1.2
ISO/IEC 27001:2022 + Amd 1:2024 · Supporting contribution
The procedure connects maintained assessment and acceptance criteria, comparable repeated assessments and CIA risks within scope with owners, reasoned consequences and likelihoods, risk levels and prioritisation. The user must decide suitable criteria and actually carry out and retain assessments.
Read the source ↗ISO/IEC 27001 · 6.1.3
ISO/IEC 27001:2022 + Amd 1:2024 · Supporting contribution
Treatment is connected with necessary safeguards, a complete Annex A comparison, SoA justifications and actual implementation status, the treatment plan and explicit risk-owner consent to the plan and residual risk. Specific decisions and actual treatment remain operational work.
Read the source ↗ISO/IEC 27001 · 6.2
ISO/IEC 27001:2022 + Amd 1:2024 · Supporting contribution
Objective planning considers the policy, applicable requirements and risk assessment and treatment. The procedure identifies measurability where practicable, communication, monitoring and updates, as well as work, resources, ownership, completion and result evaluation. Objectives must be defined for the organisation and followed up.
Read the source ↗ISO/IEC 27001 · 9.1
ISO/IEC 27001:2022 + Amd 1:2024 · Supporting contribution
The procedure defines the subject, suitable method and source, and responsibilities and timing for collection and evaluation. Actual results are retained and assessed for security performance and ISMS effectiveness. A register or software dashboard alone does not evidence this evaluation.
Read the source ↗ISO/IEC 27001 · 8.2
ISO/IEC 27001:2022 + Amd 1:2024 · Supporting contribution
The workflow provides for repeated risk assessments at planned intervals and when significant changes are proposed or occur, and retains results. The organisation must actually apply the defined method.
Read the source ↗ISO/IEC 27001 · 8.3
ISO/IEC 27001:2022 + Amd 1:2024 · Supporting contribution
The agreed risk treatment plan is translated into specific work, actually implemented and maintained with retained results at the related state. Planning and links alone do not demonstrate execution.
Read the source ↗
Consider DORA without reducing selection to it
For relevant insurers, the DORA Regulation forms part of the framework; scope and exemptions need assessment. Comprehensive procurement must also consider registers, incidents and resilience testing. Our register data quality guide explains the connection between contract, service and function.
Record which insurance service the pilot covered, which dependencies were checked and which requirements remain unresolved.
Test Kopexa with a bounded claims process and sanitised records. A dependable pilot ends with a traceable action decision, beyond another overview of all risks.
Quick answers
Frequently Asked Questions
Still have a question? Find the answers here.
Is one central risk value enough for every insurance process?
No. Impact, development over time and fallback procedures can differ substantially. Assess the affected process and its dependencies.
Sources
- Regulation (EU) 2022/2554 — Europäische Union [Accessed ]