Guide
TISAX preparation software: Close site gaps before assessment
Choose TISAX software by testing scope, assessment objectives and measures against a customer order. Includes a site-specific test case.


The assessment date is approaching. One site has complete evidence, another lacks approvals, yet the questionnaire still looks mostly green. TISAX preparation first needs an honest view of remaining work.
This guide helps identify site-specific gaps before assessment and test how they are addressed. TISAX concerns assessments and exchange of labels; software supports your preparation.
From agreed scope to a working plan
Clarify assessment objectives and scope with the business partner. The ENX procedure distinguishes registration, assessment and result exchange. Software supports internal preparation without replacing these steps.
For selection, build your own worklist: which content applies, what implementation exists, which evidence is missing and who closes the gap? A completed questionnaire does not automatically answer the last question.
Handling deviations is the most important function
Take a visitor management process. Site A has an approved rule and suitable evidence of its application. Site B uses the same template but has not introduced the workflow.
Ask to see both states during testing. A shared policy must not cause implementation to appear evidenced at both sites. Site B’s work needs an owner, deadline and separate verification of completion.
In Kopexa, evidence belongs to measures, which are mapped to controls. This distinguishes implementation from the requirement. Evidence must substantively cover the appropriate sites and periods; our guide to evidence for multiple audits explains reuse limits.
Four things to demonstrate before purchase
| Check | Dependable result |
|---|---|
| Supported ISA version and usage rights | Clearly identified content with permitted use established |
| Site-specific gap | Missing implementation stays visible despite a central template |
| Correcting a finding | Finding, measure and renewed evidence remain traceable |
| Change after assessment | A new owner or site triggers targeted review |
Do not demand perfect demo data. Missing evidence is more revealing for selection than a fully completed sample project.
Use this template in these measures
Implementation measure
Approve and follow through supplier services
Mapped requirements (5)
- A.5.19 · Informationssicherheit in Lieferantenbeziehungen (DE)
Supporting contribution
Sections 1 and 2 connect the specific service, responsibility, risk-based assessment and approval in the existing record. Actual assessment and decisions must be made for your own services.
- A.5.20 · Berücksichtigung der Informationssicherheit in Lieferantenvereinbarungen (DE)
Supporting contribution
Section 3 supports appropriate security agreements and traceable deviation decisions. Actual agreement, legal review and implementation remain necessary.
- A.5.21 · Management der Informationssicherheit in der IKT-Lieferkette (DE)
Supporting contribution
Section 3 includes relevant ICT subcontractors, critical components, integrity and support in selection and agreements. Real supply-chain information and suitable evidence still need to be obtained and evaluated.
- A.5.22 · Überwachung, Überprüfung und Änderungsmanagement von Lieferantendienstleistungen (DE)
Supporting contribution
Section 5 connects regular and change-triggered service reviews with change decisions and corrections in the existing record. Reviews, evaluation and follow-up work must actually be carried out.
- A.5.23 · Informationssicherheit bei Nutzung von Cloud-Diensten (DE)
Supporting contribution
Sections 4 and 5 support the cloud lifecycle through specific task allocation, your own use, reviews, changes and exit. They do not prove actual configuration or implementation.
Further framework mappings of this measure
TISAX · 6.1.1
VDA ISA 6.0.3 · Partial contribution
The joint workflow supports risk-based selection and assessment of security-relevant services, suitable agreements and review of contractors and partners. Actual assessments, completed agreements, review results and applicable additional requirements remain to be evidenced. This is not a separate cloud ISA crosswalk or a claim to full objective fulfilment.
Read the source ↗
Keep preparation connected to ongoing ISMS work
Kopexa adds information assets, other assets, risks and processes to control work. You can explain why a measure is needed and which information it protects. Versioned documents and approvals prevent assessments relying on an arbitrary file version.
Employees, systems and customer requirements continue changing after the assessment. Check how those changes reach security work. A reminder for the next assessment alone is not an operating model.
Our TISAX roadmap helps structure the project. For customer requirements and delivery capability from a commercial perspective, see our automotive supplier solution.
Test with a real gap
Bring a sanitised open finding into Kopexa’s two-week guided trial. The test succeeds when the responsible people can independently trace the path from gap to verified implementation. A positive assessment remains the responsible audit provider’s decision.
Quick answers
Frequently Asked Questions
Still have a question? Find the answers here.
Does the software issue a TISAX label?
No. Labels result from the assessment process. Software supports your preparation and ongoing security work.
Sources
- TISAX: Procedure and assessment — ENX [Accessed ]